We managed to finish getting the subfloor in the main bathroom which was my main goal for March.
Next up: Some light electrical and then installing the base of the walls with some board (Durock for some at least).
We managed to finish getting the subfloor in the main bathroom which was my main goal for March.
Next up: Some light electrical and then installing the base of the walls with some board (Durock for some at least).