Always Be Knowling


More detail of the framed wallpaper.

Oh, did I mention I’m painting the imperfections gold (Kintsugi style)?

I am.


Framing around the original wallpaper in the 2nd floor hallway at Ashland.


The hardest part of installing base trim in this particular house? There are curves.


Still Life: Nail gun and shoe molding.


For those who’ve been following along with our flooring project in the Ashland House, my wifedid a good post with some before and afters.


Base shoe ready for painting.


Floors installed and finished. Next up: Paint and install shoe molding. Then, sand and paint the trim.


Wet final coat is wet.


Ashland reclaimed flooring: First coat.


Sanding the reclaimed flooring at Ashland.


Floor installed. Next up: Sanding and finishing in natural. Expecting lots of character to shine through.


Reclaimed flooring installation is moving along at the Ashland house. The plan is, once it’s installed, to sand and finish it in a natural tone so it’ll be lighter and more tone consistent than seen here.


New (reclaimed) flooring to go into the second floor at the Ashland house.

This is only half of it. I’ve got another load about this size to pick up.


Also, finding things like this underneath which gives us some idea as to when the subfloor was put on top.


Today’s whoa to wow: Removing tile and subfloor from 2nd floor hallway at our main house (Ashland).


I use this for just about every project I do. I call it my secret weapon.


Today: Painting the stairwell and hallway.


Today’s stay at home activity: Ceiling paint in the stairwell and hallway.